Millstream River

Access to the water

Swimming hole

Access trail

Garbage collected

Sign to promote cleanliness

Millstream 51

August 27, 2009 - February 9, 2015

Issue:

About 30 m downstream of the highway, there is a deep swimming hole with a cliff as a jumping platform. A small trail leads to the top of the rock cliff on the right bank and ends up at a fire pit area.

Action Required:

A considerable amount of garbage was found around this site and along the Millstream river. In 2014, the groupe conducted a cleaning of the Millstream river. The groupe also designed signs to install along the river to increase awareness of the environment and invite the visitors to bring their garbage with them.

Negligible alteration

Minor alteration. Must follow site

Alteration with possibility of impact

Alteration with impact. Recommended intervention.

Full restoration

incomplete restoration or monitor

Restoration to be completed